HSR Layout residents haven’t got a road in 9 months!
By Zahid H Javali In January, BWSSB dug open 15th B Main Road, Sector 3, HSR Layout, to lay sewage lines. Later, BBMP widened the storm water drain. And then, COVID-19 happened, followed by the rains. Besides, the coordination issues between BWSSB and BBMP led to more delay. The residents suffered the most, as they … Read more